A journey of a man trying to fight his Ooh! Shiney! addiction while painting interesting things at the same time....
zaterdag 21 maart 2020
How do you like this set up? (games table)
Looked at what my max possibilites are gaming table wise. Storage underneath, book case at the end. You can move around the 3 sides easily enough. What do you think?
zondag 8 maart 2020
Change is afoot
A few changes are happening (or are about to happen).
I'm currently halfway into my course on Chronic Pain Management, and, as I was warned beforehand, my pain levels and pain killer use seem to be maxed out on a daily basis. Excercise is going ok-ish, saying no to people (as not to overextend myself) could be better, but at least some progress has been made. It's nice to be back in a regular small group of people, who more or less have the same issues. It's costing me a small fortune in parking fees though, sheesh.
It's been 4+ years since my accident, in this time I got another degree, did internships and looked for jobs that my physique and mind can handle. Sofar....no luck. My benefits will run out on the 18th and I've been to the benefits agency to be tested by their physician to see what my future possibilities are with my current (and future) limitations. This could mean I'm 100% cleared for work, or 100% not, or anything in between. As much as I want to work again, I aso have to take into account what I can handle on a daily basis. Which to be honest, isn't much. I can do a bit of work, either physical or mental, and need frequent breaks just to keep going for a few hours. Hardly alluring for employers...and bloody annoying to run a house hold with2 small children. Anyway, I should have a decision from them in 1-2 weeks and from there we will see how my life gets turned upside down, again <sigh>
Moving on up (into the attic) is going rather well, but in bursts. As I'm being taught now to put myself (and my family) first I just planned 2 afternoons a week to work on getting stuff up to the attic. The occasional box or item in between is fine, but by planning I can get some help from Kim or a friend to lift stuff up. I'm quite happy with the results sofar, even if it is going slow......steady wins the race. Also, it's very relaxing to be uphere with the wind and rain tapping on the window.
And I've even done a bit of modelling <shocker>
A old Airfix Chi-Ha I picked up for 3 euros, now a wreck for Vietnam. Well, it will be once painted and tufted.
Right, I'm knackered.....more later this week.
I'm currently halfway into my course on Chronic Pain Management, and, as I was warned beforehand, my pain levels and pain killer use seem to be maxed out on a daily basis. Excercise is going ok-ish, saying no to people (as not to overextend myself) could be better, but at least some progress has been made. It's nice to be back in a regular small group of people, who more or less have the same issues. It's costing me a small fortune in parking fees though, sheesh.
It's been 4+ years since my accident, in this time I got another degree, did internships and looked for jobs that my physique and mind can handle. Sofar....no luck. My benefits will run out on the 18th and I've been to the benefits agency to be tested by their physician to see what my future possibilities are with my current (and future) limitations. This could mean I'm 100% cleared for work, or 100% not, or anything in between. As much as I want to work again, I aso have to take into account what I can handle on a daily basis. Which to be honest, isn't much. I can do a bit of work, either physical or mental, and need frequent breaks just to keep going for a few hours. Hardly alluring for employers...and bloody annoying to run a house hold with2 small children. Anyway, I should have a decision from them in 1-2 weeks and from there we will see how my life gets turned upside down, again <sigh>
Moving on up (into the attic) is going rather well, but in bursts. As I'm being taught now to put myself (and my family) first I just planned 2 afternoons a week to work on getting stuff up to the attic. The occasional box or item in between is fine, but by planning I can get some help from Kim or a friend to lift stuff up. I'm quite happy with the results sofar, even if it is going slow......steady wins the race. Also, it's very relaxing to be uphere with the wind and rain tapping on the window.
![]() |
| (Ignore the labels, they all need to be resorted and reprinted....at a later date) |
And I've even done a bit of modelling <shocker>
A old Airfix Chi-Ha I picked up for 3 euros, now a wreck for Vietnam. Well, it will be once painted and tufted.
Right, I'm knackered.....more later this week.
Labels:
20mm,
Scenery,
Scratchbuilding,
Vietnam,
Wreck
donderdag 27 februari 2020
Clean Desk Policy
Slowly moving stuff up into the attic storage space. Tired from everything, and having a shot fuse makes a not very fun Johan. Can't wait till the old room is cleaned out so we can start rebuilding it for Nikki, and I have a ton of sorting to do.
Till then, I'm enjoying my new desk space, but I really need to find a webcam with a decent mike so I can do more voice to text as my hands are killing me. And yes, I realize I'm very lucky to have such a fantastic space. Just sometimes wish that the reason I have been able to pay for all of this had never happend, as sometimes it is just too much and the pills cannot dull the pain.
maandag 10 februari 2020
Aziz, light!
Hung the main room LED panel. Didn't fit as advertised. Got fed up, took a break, grabbed 30 cents worth of washers from my spares box and dropped the light by 6mm, and then everything fit.
Shot taken with door closed and screen closed (pitch black room) and new light on. Thats a lot of light :)
Same one will be over my workdesk, still figuring out the best way to mount it.Also fixed the ripped out door with longer screws, and replaced them with the other doors as well.
Now....sleep.
zondag 9 februari 2020
Sea of Grey
Everything is painted, and the first room has the levelling compound added. Not long now, hope to start laying floring this week :) Next weekend we will level the other room (as we can't drag down the washer/dryer)
Looks lovely as is, tbh. Soundproofing though, not so much....
The leveller did open one of the doors thinking it opened away from the wall.....and completely ripped it out of the wall. Oops. The builder apolagised, but he and I know those are the standard screws that come with such doors. I'll put in new, longer ones somewhere this week. Shame about the door, but such is life.
I made a small visit to Gerard Boom (from Shifting Lands) to have a chat and pick up a set of power pylons for This is not a Test. They are a bit basic, but look the part and are easy enough to build, only 1 part gave me a bit of a headache and that got sorted soon enough. There are no power line couplings so I will have to scratchbuild those or have someone lasercut them for me so I can add them. Every little bit helps.
I also picked up some used H0 bits, a fixed crane, a diesel/LPG btank and a transformer housing. This, combined with the 5 bags of Faller Cemnet Factory and Diesel Storage I picked up the other day, will keep me busy for a while. After stripping the broken (or easily broken) parts I'm now at this stage, all parts for the factory complex. They need details that I can't add atm as my tools are hidden behind all of the crates. Oh well.
Looks lovely as is, tbh. Soundproofing though, not so much....
The leveller did open one of the doors thinking it opened away from the wall.....and completely ripped it out of the wall. Oops. The builder apolagised, but he and I know those are the standard screws that come with such doors. I'll put in new, longer ones somewhere this week. Shame about the door, but such is life.
I made a small visit to Gerard Boom (from Shifting Lands) to have a chat and pick up a set of power pylons for This is not a Test. They are a bit basic, but look the part and are easy enough to build, only 1 part gave me a bit of a headache and that got sorted soon enough. There are no power line couplings so I will have to scratchbuild those or have someone lasercut them for me so I can add them. Every little bit helps.
I also picked up some used H0 bits, a fixed crane, a diesel/LPG btank and a transformer housing. This, combined with the 5 bags of Faller Cemnet Factory and Diesel Storage I picked up the other day, will keep me busy for a while. After stripping the broken (or easily broken) parts I'm now at this stage, all parts for the factory complex. They need details that I can't add atm as my tools are hidden behind all of the crates. Oh well.
donderdag 23 januari 2020
Sanding the floor, glacier style
One of our friends had offered to sand the concrete as it is a bubbly and wavy mess, with lots of cracks, holes and raised pebbles. Not quite up to date to current conrete casting tbh (far from it). He does this for a boss, but wasn't scheduled to work today so he passed by to help us out.
Our contractor scoffed at the idea, didn't think it would be easy at all to sand the concrete, but he did not take into account the industrial model sander our friend brought with him (it didn't look like much, but the sander had some serious big cutter teeth discs)
Like a glacier went over a rock bed, excellent, he really knows his job well. I need to bring up a large level tomorrow and go over the floor and see which areas need levelling before we can put down the flooring.
We stripped back the old stairsway up to the attic.....removed all the bits of carpet, and about 5 kilos of staples, nails and dirt. Will be sanded tomorrow.
Slow but steady, we are getting there.
Our contractor scoffed at the idea, didn't think it would be easy at all to sand the concrete, but he did not take into account the industrial model sander our friend brought with him (it didn't look like much, but the sander had some serious big cutter teeth discs)
Like a glacier went over a rock bed, excellent, he really knows his job well. I need to bring up a large level tomorrow and go over the floor and see which areas need levelling before we can put down the flooring.
We stripped back the old stairsway up to the attic.....removed all the bits of carpet, and about 5 kilos of staples, nails and dirt. Will be sanded tomorrow.
Slow but steady, we are getting there.
dinsdag 21 januari 2020
I have the power! (sort of)
We had the electrician visit us today and all the sockets and switches have now been fitted. 1 UTP port was extremely annoying and had both of us scratching our heads trying to sort out the error code we kept getting for a good 30 minutes of fitting and refitting the socket. And then it just worked...all hail the Omnissah?
We should be able to put in the floor in the weekend of 1-2nd, maybe even get the desk upstairs, maaaaybe I can get the computer and assorted equipment set up....but I'm not pushing my luck.
And now we will look at some shocking socket pics.
And the electrical sunscreen/anti theft thingamajig is now operational as well.
Meanwhile.....I've started a 10 week pain management course to see if I can raise my energy levels. Can't say too much about it, but it is a group of 40-60 year olds that have the same issues as I do. Very tiring though.....
We should be able to put in the floor in the weekend of 1-2nd, maybe even get the desk upstairs, maaaaybe I can get the computer and assorted equipment set up....but I'm not pushing my luck.
And now we will look at some shocking socket pics.
And the electrical sunscreen/anti theft thingamajig is now operational as well.
Meanwhile.....I've started a 10 week pain management course to see if I can raise my energy levels. Can't say too much about it, but it is a group of 40-60 year olds that have the same issues as I do. Very tiring though.....
Abonneren op:
Posts (Atom)




















