The main work is finished, and the renderer will be here tomorrow and on monday. Next week the electrical work will be finished when the render has dried for a few days, the doors to the storage spaces will be installed, and I need to get some prep work done for painting....everything. When that is done the radiator will be installed and we can put down the floor.
And this is how it looks now, fancy new door as well. But.....when the floor is done, I must install a door stop, else it slams right into the roof if it swings open too far. Don't want that.....
Opening nicely moved to the middle. Hatch will be made after the renderer is done.
And here we run into a tiny issue that changes a lot..... to create a bit more space, we had the old railing taken apart, and the floor extended a bit over the staircase. Then re used what we could of the old railing. Plus we had the cables and pipes and what not covered with panels to keep everything clean etc.
All well and good looking but....we created a choke point that is 70cm's and the plasterboard won't be too keen on having a sofa rammed into it. So I dropped that idea.
Now, no sink and no (sleeping)sofa makes for a lousy guestroom, so for all I care a gaming table is back on the menu. :)