Calling the crane done. Johann standing as a size reference. Yes, she is a big girl!
![]() |
| My dinner table is a disaster zone, so tomorrow clean up so I can do the next set of drawings and vacume a gazillion small bits of wood from the floor. |
My estimated time for the crane build was 3 weeks, same for the cargoes. I'm actually 1 week ahead which is nice for a change. 1 week per cargo is doable, and then paint all of them combined so I'm ready ahead of time.....cause I have a lot of other things to do, like take a ton of photo's of all of the 20mm stuff I need to sell. Ugh.


Geen opmerkingen:
Een reactie posten